/
14: The Workers Building the San Marcos Hotel

14: The Workers Building the San Marcos Hotel

► Next Image ►

A group of the workers who built the San Marcos Hotel. The third man from the left wearing a tie is Walter Hoag, the first Superintendent of Construction; he resigned in October 1912 and was replaced by Harry Jennings. Note the workers posing for the photograph on the second floor of the hotel

image-20240506-163043.png

Description: Between 100 to 150 men were employed in constructing the hotel. W.R. Hoag was the superintendent of construction, but he resigned in October 1912 and was replaced by Harry Jennings. Frank Newman was the head of the plumbing crew; J.M.  Stein was the machinist and engineer; S.S. Bradley was the electrician; and Joe Cashman was the general manager. Some of the workers came from California, but Hoag expressed a preference for hiring local men to work for him.

Accession #: 03-4-1

Gift of: San Marcos Resort

► Next Image ►

Related content

2003.4.1
More like this
Timeline of the San Marcos Hotel
Timeline of the San Marcos Hotel
More like this
04. The Construction Workers
04. The Construction Workers
More like this
10: Superintendent Harry S. Jennings on the Site
10: Superintendent Harry S. Jennings on the Site
More like this
1986.16.21
1986.16.21
More like this
04: Walls In Place For Holding Concrete
04: Walls In Place For Holding Concrete
More like this