The plans for the San Marcos Hotel called for a fireproof building made out of reinforced concrete. This required massive amounts of concrete, stone, and steel which was delivered from across the West. The stone and concrete was delivered by the Southern Pacific Railroad. Colorado Fuel and Iron Works in Pueblo, Colorado, was unable to keep up with the demand for steel, which led to major delays in construction. Some materials came from local companies such as the Chandler Lumber Company and the Chandler Brick Yard.
The photo above shows the rock crushing machinery at work creating concrete.
Accession #: 87-8-13
Gift of: City of Chandler
Accession #: 87-8-13
Gift of: City of Chandler
Workers construct the distinctive ribbed ceiling of the hotel’s second floor.
Accession #: 87-8-18
Gift of: City of Chandler
Accession #: 87-8-18
Gift of: City of Chandler
, multiple selections available,
Related content
1987.8.13
1987.8.13
More like this
08: Rock Crushing Machinery for Making Concrete
08: Rock Crushing Machinery for Making Concrete
More like this
Week 11: Building the San Marcos Hotel
Week 11: Building the San Marcos Hotel
More like this
04: Walls In Place For Holding Concrete
04: Walls In Place For Holding Concrete
More like this
11: Construction Progress on the San Marcos Hotel
11: Construction Progress on the San Marcos Hotel
More like this
02.2 C. B. Weaver Construction Company Hired to Build Hotel
02.2 C. B. Weaver Construction Company Hired to Build Hotel
More like this